Fuel-Trac: Fresh Nuclear Fuel Database
NAC analysts and consultants are available to provide customized reports
and interpretation from this database per client specifications.
Reactor requirements calculated from the fuel
cycle plan database serve as the starting point for the Fuel-Trac
fresh fuel section of the database. Items tracked include the following.
- All Nuclear Fuel Cycle Facilities
- Country
- Owner
- Status (Operating, Shutdown)
- Startup Date
- Shutdown Date
- Decommission Date
- Production Lead Times
- Uranium Mining & Milling Facilities
- Production in Lbs U3O8
- Capacity in Lbs U3O8
- Cost of Production
- Conversion Facilities
- Production in Kg U
- Capacity in Kg U
- Enrichment Facilities
- Production in Kg SWU
- Capacity in Kg SWU
- Fabrication Facilities
- Powder Capacity in Kg Heavy Metal
- Pellet Capacity in Kg Heavy Metal
- Assembly Capacity in Kg Heavy Metal
- Assembly Production in Kg Heavy Metal
- Assembly Type (PWR, BWR, etc.)
- Material Type (U, MOX, Th)
- Reactor Requirements (Fab, SWU, Conversion, U3O8)
- Fab Requirement Date
- Number of Assemblies
- Fab Kg of Heavy Metal Required
- Enrichment Requirement Date
- Enriched Kg Uranium Required
- Feed Percent U235
- Enrichment Kg SWU Required
- UF6 Requirement Date
- Kg U as UF6 Required
- U3O8 Requirement Date
- Lbs of U3O8 Required
- Minimum Inventory Levels (Strategic Reserve)
- Sales Commitments and Deliveries (Fab, SWU, etc.)
- Contract Sign Date
- Service or Product (SWU, Enriched U, etc.)
- Type of Contract(Fixed, Requirement, etc.)
- From Owner
- To Owner
- Destination Reactor (if applicable)
- Form of Material
- Transaction Type (Sale, Production, Capacity)
- Regular or Optional Delivery
- Assembly Delivery Date
- Assembly Count
- Fabrication Date
- Kg Heavy Metal Fabricated
- Enrichment Transaction Date
- Kg U Enriched
- Enriched Percent U235
- Feed Percent U235
- Tails Percent U235
- Kg SWU Consumed
- UF6 Transaction Date
- Kg U Converted
- U3O8 Transaction Date
- Lbs U3O8 Sold
Calculated results include the following by Commodity, Country, Country
Group, Utility, Reactor and Year:
- Reactor Requirements
- Total Requirements by Owner
- Individual Commitments - Purchases
- Total Commitments - Purchases by Owner
- Uncommitted - Shortfall between Requirements and Commitments
- Inventories by Commodity and Year